Mathews Bridge Deck Replacement Project

By admin | August 23, 2007

The Mathews Bridge was originally completed in April of 1953, the cantilever steel truss Mathews Bridge spans the St. Johns River and today brings more than 66,000 vehicles a day in and out of downtown Jacksonville along the Arlington Expressway. It was named after John E. Mathews, a Florida state legislator from the area and Chief Justice of the 1955 Florida Supreme Court. Justice Mathews was instrumental in making the bridge’s construction a reality.

Project Information: This 12.9 million dollar project, began on or about mid January, 2007. Project is being carried out by PCL Construction, and will replace the existing open grate bridge deck currently on Mathews Bridge with an “Exodermic Deck” resulting in a concrete riding surface.

An “exodermic deck system” is a steel grid filled in with lightweight concrete. This system has been successfully installed on several bridges including structures in Fort Lauderdale, West Palm Beach and the Tappan-Zee Bridge in New York which is similar to the Mathews Bridge. It has also been used on several other bridges in the United States . Supports beneath and above the riding surface will be replaced and strengthened to help provide a smoother ride across the bridge. The end result will be a solid riding surface across the entire 7,375 foot long bridge.

The Federal Department Of Transportation gave my crew among others, 90 days to complete a particular phase of the project. We replaced approximately 1600 lineal feet of grating by four lanes wide including median, with concrete.

It was a matter of removing existing grating, stingers, curb, median, and guardian rail and replaced with all new. Except the grating, that was replaced with lightweight solid concrete deck. This phase of the project was actually completed in 76 days, few days earlier than the deadline. We were all very please about it.

Technorati tag page for Mathews Bridge Deck Replacement
Related Topic Tags: . This entry Mathews Bridge Deck Replacement Project was posted on Thursday, August 23rd, 2007 at 12:35 am and is filed under Mathew's Bridge Deck Replacement. Posted by . You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

17th Street Causeway Project Details

By admin | August 22, 2007

The new 17th street causeway bridge is a variable depth segmental structure which is constructed by balanced cantilever and progressive cantilever method. In the center of the bridge, the counterweight for the bascule is housed inside of a unique Carina Pier.

Traylor Bros. was contracted by the Florida Department of Transportation to construct a mid-level bascule bridge over the Intracoastal Waterway on the 17th Street Causeway in Fort Lauderdale, Florida. This bridge is 1,908 feet long with dual 53.5 foot wide roadways, and provide a 125 ft wide by 55 ft vertical clearance at the waterway when closed. Vertical clearance, when the span opens, will be unlimited. The bridge consists of nine approach spans of precast segmental superstructure on C.I.P. piers and drilled shaft foundations, and a twin-leaf bascule span of 242 ft. The structural steel bascule spans rest on Y-legged “carina” piers of post-tensioned, C.I.P. concrete, on drilled shaft/cofferdam foundations.

During my time with Traylor Bros. I was in charge of building the carina (bascule) piers which constisted from the coffer dams, seal slabs, and a total of 18 pours per x4. The piers were a first of its kind, between all the radius and angles, it just made the formwork that much harder.

The installation of the falsework alone was quite a task. It included 24′ pipe pile and numerous sizes of beams to create a platform at elev. 10m in order to shore from.

Technorati tag page for 17th Street Causeway Technorati tag page for bascule Technorati tag page for bascule piers Technorati tag page for bascule bridge Technorati tag page for bridge Technorati tag page for cantilever method Technorati tag page for carina Technorati tag page for coffer dams Technorati tag page for florida Technorati tag page for intracoastal waterway Technorati tag page for piers Technorati tag page for traylor bros Technorati tag page for waterway
Related Topic Tags: , , , , , , , , , , , . This entry 17th Street Causeway Project Details was posted on Wednesday, August 22nd, 2007 at 9:45 pm and is filed under 17th Street Causeway. Posted by . You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

Family Day at TY Park Video 1

By admin | July 10, 2007


I was home this weekend from work (Hathaway Bridge Project in Jacksonville Florida). We went to TY Park to spend some fun quality time with my family. We had a really nice time at the the water park.

Technorati tag page for family day Technorati tag page for Family Life Technorati tag page for family video Technorati tag page for fun in the sun
Related Topic Tags: , , . This entry Family Day at TY Park Video 1 was posted on Tuesday, July 10th, 2007 at 8:25 pm and is filed under Family Life. Posted by . You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

Family Day at TY Park Video 2

By admin | July 10, 2007


See for yourself….Fun in the sun.

Technorati tag page for family day Technorati tag page for Family Life Technorati tag page for family video Technorati tag page for fun in the sun Technorati tag page for recreation Technorati tag page for ty park
Related Topic Tags: , , , , . This entry Family Day at TY Park Video 2 was posted on Tuesday, July 10th, 2007 at 8:24 pm and is filed under Family Life. Posted by . You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

Project Photo Galleries

Other Industry News

«

Palm Beach Post (blog)

Proceed carefully with Glades
Tampa Tribune
The project will create thousands of construction jobs, help clean Florida Bay, provide an adequate water supply for South Florida and save the Everglades. ...
Florida $650 Million Land Bond Faces Financial, Legal ChallengeBusinessWeek
In Deal on Everglades, a Dream Is DeferredSarasota Herald-Tribune
NYTimes tees up Crist's Everglades land deal with US SugarPalm Beach Post (blog)

all 337 news articles »
«

WCBD

Unemployment Climbed in 30 US States, Fell in Nine
BusinessWeek
“Developers can't do new projects because they're losing existing projects in foreclosures,” said Suzanne Breistol, whose Florida Construction Connection ...
Jobless lines get longerCharleston Post Courier
Vermont unemployment rate stays at 6.7 percent, 800 jobs addedVermont Biz (press release)
Birmingham-area unemployment rate hits 26-year highal.com (blog)
The News Journal -Morganton News Herald
all 1,282 news articles »


« Previous Entries Next Entries »