Past & Current Projects

Pages

Recent Posts

Archives

Random Gallery Pictures

Latest Photo Galleries

Hathaway Bridge Project Details

By admin | August 24, 2007

Hathaway Bridge

What is considered the “NEW” The Hathaway Bridge was completed in Spring of 2006. It is a one mile span over North Bay and connects Panama City and Panama City Beach. U.S. Highway 98 uses the Hathaway Bridge as it traverses across north Florida.

Project Details: This project involved designing and building services for the replacement of the four-lane Hathaway Bridge over the St.Andrews Bay intra-coastal waterway in Panama City, FL. The twin concrete segmental, post-tensioned, single cell box girder bridges measure 3,800 linear feet and 3,350 linear feet, respectively, each 80-feet wide.

Bridge segments were produced at the project’s segmental precast yard and erected utilizing the balanced cantilever method. The main span of the bridge is aproximately 330 feet with 65-foot clearance over the waterway. The bridges are being equipped with an Intelligent Transportation System (ITS) to continuously monitor and manage traffic. Aesthetic lighting will illuminate the structures from below, while a separate system will light the bridge decks from above. The project also entailed realignment of approach roadways and the removal of the old Hathaway Bridge.

(source quoted from Granites Information)

  • 22 each indicator pile, 90 - 120 feet60″ cylinder pile with PDAmonitoring
  • 198 each production pile, 90 - 120feet 60″ cylinder pile
  • 14,175 cubic yards concrete footers- Class IV mass concrete
  • 4,052 cubic yards cast-in-placesub-structure - Class IV massconcrete
  • 22 each 150 ton precast seals
  • 518 each precast segments(weighing up to 200 tons each)(45,233 cu yds) - Class IV concrete
  • 10,900,000 pounds reinforcing steel
  • 56 each pot bearings up to 6,000kips

While working for Granite Construction I supervised a crew of approximately 15 to 20 workers. My involvement in the project entailed the construction of an elevated structural slab which was mounted directly on 16, 24″ piles. An elevated structural slab is basically forming and pouring monolithic girders and slab at the same time.

I had to come up with a method of forming to pour all at once, as well as figuring the falsework into the equation.

Technorati tag page for bridge Technorati tag page for construction Technorati tag page for girders Technorati tag page for Hathaway Bridge Replacement Technorati tag page for industries Technorati tag page for monolithic girders Technorati tag page for piles Technorati tag page for slab
Related Topic Tags: , , , , , , . This entry Hathaway Bridge Project Details was posted on Friday, August 24th, 2007 at 1:29 pm and is filed under Hathaway Bridge Replacement. Posted by . You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

Project Photo Galleries

Other Industry News

«

Florida's jobless level hits a 15-year high of 7 percent in October
Sun-Sentinel.com, FL - Nov 21, 2008
Major South Florida employers, including DHL, Republic Services, FPL, American Express and Office Depot, have announced layoffs in recent months. ...
«

MiamiHerald.com

Judge removes hurdle in Florida Marlins' ballpark proposal
The Canadian Press, MIAMI - Nov 21, 2008
The judge previously rejected several other Braman lawsuit claims, including an allegation that the project was hatched in secret in violation of Florida's ...
Marlins win case, but new park may not be ready for 2011 MiamiHerald.com
New stadium clears last legal hurdle MLB.com
Judge: Marlins Stadium Construction Can Legally Begin Local10.com
The Business of Sports - CBS 4
all 98 news articles